Skip to main content

images

Boothne - Based on a True Story Boothne - Based on a True Story

Colorful painting that may be of the ground and sky over the words "Janet Bothne Based On A True Story 36 x 72 Acrylic on Canvas - Diptych."

Veterans Day Ceremony 2024 Flyer Veterans Day Ceremony 2024 Flyer

A flyer for the 2024 Veterans Day Ceremony with an American flag graphic in the background. At the bottom of the graphic is sponsor logos including One Albuquerque, New Mexico Veterans Memorial, United Veterans Council of Greater Albuquerque, and New Mexico Rail Runner. Text on the flyer reads: Veterans Day, Monday, November 11, 2024. 9 am to 10 am Veteran's Day Parade. 10:30 am to 12 pm Please join us for an all new experience honoring our veterans with provided by Dukes of Albuquerque Concert Band. New Mexico Veterans Memorial Park, 1100 Louisiana SE Albuquerque, NM. For more information call 505-768-4496.

Veterans Day Parade 2024 Flyer Veterans Day Parade 2024 Flyer

A flyer for the 2024 Veterans Day Parade. Flyer text: Veterans Day Parade, November 11, 2024. Start: 9 a.m. USS Bullhead Memorial Park, 1606 San Pedro SE. End: 10 a.m. New Mexico Veterans Memorial Park, 1100 Louisiana SE. For more information please email [email protected].

Alameda Open Space Trailhead Site Plans Alameda Open Space Trailhead Site Plans

A map showing 3 phases of the Alameda Open Space Trailhead Site Plans. Phase 1 - New plazas, new Soar Flower, new Signage and Organization/Kiosk to the northwest and southwest of current picnic areas. New plantings, trees, shrubs, and irrigation. Widen the existing trail going from the west side of the site to the south side of the picnic areas, remove a large bump and mill in place on the existing trail to the southeast of the picnic areas. Phase 2 - Construct a new asphalt trail with bollards at each end and signs to dismount bikes on the western side of the tree grove, parallel to the trail on the eastern side of the trees coming from the south up to the southwest side of the picnic areas. Add a new trail connecting the northern part of the new asphalt trail with the existing trail that will be widened in phase 1. Mill in place (crushed soft surface) the existing trail that runs north to south on the east side of the tree grove. Phase 3 - Potential overlook build just south of the two south to north running trails from phases 1 and 2.

Volunteers - Daniel Webster Cleanup Volunteers - Daniel Webster Cleanup

Group photo of Daniel Webster Cleanup volunteers outdoors next to a park. The volunteers are wearing sky blue colored polo shirts and are holding up a banner that reads: 2021 Clean World Movement in the United States. Daniel Webster Park Cleanup in bold.