Skip to main content

images

Alameda Open Space Trailhead Site Plan Phase 1 - 2024

The site plan for Phase 1 of the Alameda & Rio Grande Open Space Trailhead Project. This includes removing existing trees and repair on an existing trail section (August 2024),as well as widening the existing asphalt trail and constructing a new asphalt trail (September 2024).

IDO locating UPC lot number IDO locating UPC lot number

This image highlights where to locate the UPC lot identification number for any lot withing City of Albuquerque

No E-Bikes Sign No E-Bikes Sign

Brown and white sign that reads "No E-Bikes." Sign features a bike symbol with a plug in the back with a red crossed out circle.