images
Colorful painting that may be of the ground and sky over the words "Janet Bothne Based On A True Story 36 x 72 Acrylic on Canvas - Diptych."
Abstract tree painted in from of the Bosque with the Sandia mountains in the background.
A map showing 3 phases of the Alameda Open Space Trailhead Site Plans. Phase 1 - New plazas, new Soar Flower, new Signage and Organization/Kiosk to the northwest and southwest of current picnic areas. New plantings, trees, shrubs, and irrigation. Widen the existing trail going from the west side of the site to the south side of the picnic areas, remove a large bump and mill in place on the existing trail to the southeast of the picnic areas. Phase 2 - Construct a new asphalt trail with bollards at each end and signs to dismount bikes on the western side of the tree grove, parallel to the trail on the eastern side of the trees coming from the south up to the southwest side of the picnic areas. Add a new trail connecting the northern part of the new asphalt trail with the existing trail that will be widened in phase 1. Mill in place (crushed soft surface) the existing trail that runs north to south on the east side of the tree grove. Phase 3 - Potential overlook build just south of the two south to north running trails from phases 1 and 2.
Group photo of Terrapin Hospitality volunteers outdoors next to a curb with a stack of organized trash bags.
Group photo of Daniel Webster Cleanup volunteers outdoors next to a park. The volunteers are wearing sky blue colored polo shirts and are holding up a banner that reads: 2021 Clean World Movement in the United States. Daniel Webster Park Cleanup in bold.
A rendering showing the renovation design of Phil Chacon Park. Updated March 7, 2025.
An outdoor amphitheater with wood benches in rows and a stone shelter area behind them.