2nd Street Rehab/Sidewalk and Lighting Improvements Project (CN A302300)
Information about 2nd Street Rehab/Sidewalk and Lighting Improvements Project (CN A302300).
Project Limits
- 2nd Street at Hazeldine -1st Street
 - Posted speed limit: 25 miles per hour
 - Roadway classification: Major Collector
 
Purpose & Need
- Traffic calming
 - Multimodal
 - ADA compliance
 - Lighting
 - Economic development
 
2022 2nd Street Speed Study
2022 Speed Study, conducted by Lee Engineering:
2nd Street: Avenida Cesar Chavez to Hazeldine Avenue
- 48-hour traffic counts
 - Collected volume, speed
 - Crash Data: 29 Crashes (2015-2019)
 - Qualifies for traffic calming measures.
 
2nd Street & Hazeldine Avenue-1st Street Traffic Study
Crash data (2016-2020)
- 10 total crashes
 - 1 injury, 9 property damage only
 
Crash Types
- Fixed Objects: 3
 - Angle: 2
 - Head-On: 2
 - Parked Vehicle: 2
 - Other: 1

 
Roundabout Alternative
Benefits
- Lower vehicle speeds
 - Reduce conflict points
 - Promote a continuous flow of traffic
 - Improve Safety Reduces emissions
 - Fewer pedestrian/bicycle crashes
 

*City of Albuquerque has secured FHWA Funds for the project.