images
An aerial map showing a dotted line going east on the Embud Channel trail to Washington St., south on Washington St. to Indian School Rd., then west on Indian School Rd to the North Diversion Trail. A solid line labled Phase one goes north on the diversion trail until it ends right before the main road.
An aerial map with a dotted line going around a large field that has a residential area on the northeast side. There is a solid black line on the west side labled Phase two. No streets are labeled.
A flyer describing event details. 2901 Candelaria Rd NW
This image is an initial rendering of the community garden design proposed to Parks and Recreation Department. There have been some modifications to simplify the design but construction is underway.
This document shows the construction plans for Santa Barbara-Martinez Town community garden. This site will complete construction in Winter 2026 going into 2027.
An aerial map showing a bicycle parking area for the Balloon Fiesta in the lot northwest of Indian School and Unibersity. The route to leave is south from the lot to Indian School, then north on Indian School.
Volunteers caring for the production rows at the Project Feed the Hood Community Garden.
Three people creating an adobe clay mixture for a new horno at the community garden.