Skip to main content

images

The site plan for Phase 1 of the Alameda & Rio Grande Open Space Trailhead Project. This includes removing existing trees and repair on an existing trail section (August 2024),as well as widening the existing asphalt trail and constructing a new asphalt trail (September 2024).

This image highlights where to locate the UPC lot identification number for any lot withing City of Albuquerque

Brown and white sign that reads "No E-Bikes." Sign features a bike symbol with a plug in the back with a red crossed out circle.