Skip to main content

National Pollutant Discharge Elimination System Manual

Storm Water Hotline

To report waste and toxic dumping, email the Storm Water Hotline at [email protected] 

Information about the National Pollutant Discharge Elimination System Manual

Final Modified Permit Effective June 27, 2019

The 2017 Construction General Permit has been completed by the U.S. Environmental Protection Agency (EPA)

Additional Notes

Sediment Control Plan Required for New Mexico

NOI forms now have a two-week (14 day) waiting period to allow the U.S. Fish and Wildlife Service time to review regarding endangered species and for public comment.