images
A side and top view showing an 18 to 24 inch curb cut with sloped sides at 45° with the bottom sloped toward basin.
A top and side view of a 4” Curb Core: Angled drill core at 45°, starting just below street grade.
A curb with a section cut out allowing water to run from the street into a landscaped area between the sidewalk and street.
A diagram showing the specifications for a curb cut and sediment trap for green stormwater infrastructure.
A diagram showing the specifications for a curb core and sediment trap for green stormwater infrastructure.
Jennifer Turner and Mayor Keller at East Central Press Conference
before and after westgate community center BEFORE DIRT LOT
A rendering of a one-way street with two vehicles on the two-lane road, a bike lane, and flanking sidewalks lined with trees.
A rendering of a one-way, two-lane street with a bike lane and two flanking sidewalks lined with trees.
A rendering of a one-way, one-lane street with a bike lane and two flanking sidewalks lined with trees.
A rendering of a two-way, two-lane street with a bike lane and two flanking sidewalks lined with trees.
Four images showing not to stop or park in any bike lane, written in Spanish.