Modified items All recently modified items, latest first. Landscaping Along Juan Tabo Between Southern and Mirabelle Plans for the landscaping project in progress on Juan Tabo between Southern and Mirabelle. The photo is a schematic of the placement of trees along the pedestrian walkway on Juan Tabo between Southern and Mirabelle Rocky Top Drive Solar Lighting Installed Photo of the Solera Pedestrian Walkway Solar lights installed on Rocky Top Drive. Juan Tabo Hills Phase II & Phase III Renovation of the Juan Tabo Hills features: Phase II installation of playground slides and Phase III construction of a new dog park. O-21 Approved CS FA1 Rogers O-21 Approved CS FA1 Rogers Rocky Top Solar Light Example Photo depicting the all-in one design of pedestrian solar lights installed by Solera Rocky Top Drive Solar Lighing for Pedestrian Walkway Design Rendering of installed solar pedestrian walkway light along Rocky Top Drive. Thirty-seven show installed, with five remaining to be installed. Public Notice - 2023 Consolidated Annual Performance Evaluation Report (CAPER) - Spanish A PDF of the Public Notice for the 2023 Consolidated Annual Performance Evaluation Report (CAPER) in Spanish. Public Notice - 2023 Consolidated Annual Performance Evaluation Report (CAPER) A PDF of the Public Notice for the 2023 Consolidated Annual Performance Evaluation Report (CAPER). Health, Housing & Homelessness 2023 Semi-Annual July 2023 - December 2023 2023 Semi-Annual July 2023 - December 2023 report. 2023 Semi-Annual January 2023 - June 2023 2023 Semi-Annual January 2023 - June 2023 report. 2022 Semi-Annual July 2022 - December 2022 2022 Semi-Annual July 2022 - December 2022 report. Dahlia 'Café au Lait' Dahlia 'Café au Lait' What the City Buys Wednesday, August 21 2024 Albuquerque Museum Presents “Broken Boxes: A Decade of Art, Action, and Dialogue” Exhibition celebrates 10 years of the podcast of the same name and amplifies the collective strength of contemporary artists. Alvarado Transportation Center Bus pulling up to the Alvarado Transportation Center Alameda Open Space Trailhead Site Plan Phase 1 - 2024 The site plan for Phase 1 of the Alameda & Rio Grande Open Space Trailhead Project. This includes removing existing trees and repair on an existing trail section (August 2024),as well as widening the existing asphalt trail and constructing a new asphalt trail (September 2024). 3rd and Central Mural Site Images Images of street mural site at 3rd St and Central Avenue. CPOA Board Polices and Procedures A PDF of CPOA Board Polices and Procedures. < Previous 20 items 1 ... 689 690 691 692 693 694 695 ... 2363 Next 20 items >