Pueblo Alto Mile Hi Green Stormwater Infrastructure
Phase IIIA in Progress

Background and Goals
The primary focus of this project is to reduce flooding and drainage problems south of Constitution Ave to Lomas Blvd, between San Pedro Dr and Washington St.
Existing underground stormwater drainage infrastructure no longer has the capacity to withstand larger storm events, specifically 100-year storms. Smaller, neighborhood-level, green stormwater interventions will be implemented to mitigate local drainage issues, while the larger drainage projects are being planned and implemented.
Construction has started on this, the City's first neighborhood-scale Green Stormwater Infrastructure, (GSI) project.
The Pueblo Alto neighborhood will soon be transformed with new features that won’t just calm traffic, but soak up stormwater, cut flooding, and add a fresh burst of greenery to local streets.
In the Mile Hi neighborhood, crews will be adding underground water storage tanks. These tanks remove water faster from the street level and drain in 24 to 48 hours. They are easier to clean and maintain, keep streets cleaner, and drain faster than the current system.
The overall cost of the project is about $6.5 million, and construction should be complete by the beginning of the 2026 monsoon season.
GSI has been successfully implemented in other locations nationwide and offers numerous benefits:
• Filters stormwater before it enters arroyos and the aquifer.
• Reduces sewer overflows and keeps stormwater out of the system.
• Minimizes flooding.
• Adds greenery.
• Reduces standing water and related mosquito hatches.
• Calms traffic via curb extensions.
• Quickly stores stormwater underground.

Reports
Phase 1: Pueblo Alto and Mile Hi Stormwater Interventions: Drainage Study Report
Phase 2: View the Phase II Pueblo Alto/Mile Hi Green Storm Water Intervention Report
Phase 3A: View the Phase IIIA Pueblo Alto/Mile Hi Green Storm Water Intervention Conceptual Design Report
Community Engagement
Councilor Fiebelkorn and project managers have had ongoing and consistent communications with the neighbors and neighborhood associations involved in this study.
Site and Surroundings
District 7 - Summer Ave. NE, Jefferson St. NE, Madison St. NE, Adams St. NE, Washington St. NE, and El Encanto Pl. NE