Pueblo Alto Mile Hi Green Stormwater Infrastructure

Phase IIIA in Progress

Photo of recurring flooding in the Pueblo Alto Mile High Neighborhood

Background and Goals

The primary focus of this project is to reduce flooding and drainage problems south of Constitution Ave to Lomas Blvd, between San Pedro Dr and Washington St.

Existing underground stormwater drainage infrastructure no longer has the capacity to withstand larger storm events, specifically 100-year storms. Smaller, neighborhood-level, green stormwater interventions will be implemented to mitigate local drainage issues, while the larger drainage projects are being planned and implemented.

Construction has started on this, the City's first neighborhood-scale Green Stormwater Infrastructure, (GSI) project.

The Pueblo Alto neighborhood will soon be transformed with new features that won’t just calm traffic, but soak up stormwater, cut flooding, and add a fresh burst of greenery to local streets.

In the Mile Hi neighborhood, crews will be adding underground water storage tanks. These tanks remove water faster from the street level and drain in 24 to 48 hours. They are easier to clean and maintain, keep streets cleaner, and drain faster than the current system.

The overall cost of the project is about $6.5 million, and construction should be complete by the beginning of the 2026 monsoon season. 

GSI has been successfully implemented in other locations nationwide and offers numerous benefits:
•    Filters stormwater before it enters arroyos and the aquifer.
•    Reduces sewer overflows and keeps stormwater out of the system.
•    Minimizes flooding.
•    Adds greenery.
•    Reduces standing water and related mosquito hatches.
•    Calms traffic via curb extensions.
•    Quickly stores stormwater underground.

Conceptual Design for Green Stormwater design

Reports

Phase 1: Pueblo Alto and Mile Hi Stormwater Interventions: Drainage Study Report

Phase 2: View the Phase II Pueblo Alto/Mile Hi Green Storm Water Intervention Report

Phase 3A: View the Phase IIIA Pueblo Alto/Mile Hi Green Storm Water Intervention Conceptual Design Report

Community Engagement

Councilor Fiebelkorn and project managers have had ongoing and consistent communications with the neighbors and neighborhood associations involved in this study.

Photo of flooding in the Pueblo Alto Mile Hi Neighborhood
Photo of flooding in the Pueblo Alto Mile Hi Neighborhood

Site and Surroundings

District 7 - Summer Ave. NE, Jefferson St. NE, Madison St. NE, Adams St. NE, Washington St. NE, and El Encanto Pl. NE

Visit the Project Website