Skip to main content

documents

2023 G.O. Bond Book Complete

The entire PDF of the 2023 G.O. Bond Program Book with complete information

Traffic Report 8-28-23 thru 9-11-23

Traffic Report 8-28-23 thru 9-11-23

2024 Guidelines for Consultant and Contractor Prep of Contract Docs

This is the 2023 version of the contract documents. The first document is the Guidelines for Contract Documents. Please use this document when preparing the contract books sets before delivering them to the contractor for execution.  The second document is a memo to give to the contractor with the electronic set to assist him in executing the documents.  The third document is a checklist for your use after you have received the executed documents from the contractor. Place a check by each of the items to indicate its inclusion, and write in dates in the blanks where necessary. Please submit this document to the Contract Services Division of the Department of Municipal Development (DMD) along with the completed electronic set of Contract Documents

2023 Guidelines for Consultant and Contractor Prep of Contract Docs

This is the 2023 version of the contract documents. The first document is the Guidelines for Contract Documents. Please use this document when preparing the contract books sets before delivering them to the contractor for execution.  The second document is a memo to give to the contractor with the electronic set to assist him in executing the documents.  The third document is a checklist for your use after you have received the executed documents from the contractor. Place a check by each of the items to indicate its inclusion, and write in dates in the blanks where necessary. Please submit this document to the Contract Services Division of the Department of Municipal Development (DMD) along with the completed electronic set of Contract Documents

Project No: 6323.97

Project Description: Professional On-Call construction project cost estimating services for the City of Albuquerque. Project cost estimating may be required on a broad conceptual level or with extreme detail. Additionally, City wide projects range from simple and straightforward projects to highly complex and complicated projects. The selected firm’s work may assist the City in deciding a project’s feasibility as well as the required budget for a project.

Traffic Report 9-15-23 thru 9-25-23

Traffic Report 9-15-23 thru 9-25-23

2023 Vision Zero Year in Review

2023 Vision Zero Year in Review full PDF.

Louisiana Boulevard Safe Streets Final

Louisiana Boulevard Safe Streets final PDF

Traffic Report 9-22-23 thru 10-1-23

Traffic Report 9-22-23 thru 10-1-23

City of Albuquerque MS4 Annual Report FY23

MS4 Annual Report FY23 Draft 9.28.23 (no attachments)

Traffic Report 11-6-23 thru 11-27-23

Traffic Report 11-6-23 thru 11-27-23

2024 Capital Outlay Request NPO Agreement

The Non-profit application for capital outlay for 2024

7782.92 LEgal Ad on-call geotechnical services

7782.92 LEgal Ad on-call geotechnical services

FY23 Annual Report

City of Albuquerque MS4 FY23 Annual Report

Traffic Report 12-8-23 thru 12-22-23

Traffic Report 12-8-23 thru 12-22-23

Albuquerque Musem Ed Center

Albuquerque Musem Ed Center PDF

Real-Time Crime Center & Police Tech

Real-Time Crime Center & Police Tech PDF

Public Safety Field Tech

Public Safety Field Tech PDF

State Highways and Roads Safety

State Highways and Roads Safety PDF

Housing Navigation Centers Expansion

Housing Navigation Centers Expansion PDF