NMDOT District 3 Roadwork Report Through Nov. 23

View the PDF version

All projects scheduled, weather permitting and are subject to change without notice. For online updates to projects visit www.nmroads.com.

Frontage Roads

  • I-40 eastbound frontage road from 7th-8th street
    • Nov. 14-28 from 9 a.m. – 3 p.m. for utility work. Contractor: MWI Inc.
  • I-25 southbound and southbound frontage median at Beverly Hills Ave. (South of Tramway Blvd.)
    • Right lane closure on I 25; Nov. 22-23, 2016 from 9 a.m. – 3 p.m. for utility work. Contractor: MWI, Inc.
  • I-25 northbound frontage between Cutter and Comanche
    • Left lane closed on Frontage road and right lane on the off-ramp to Comanche closed for Digital Message Sign Installation. Contractor: MWI, Inc.
  • I-25 frontage road at Osuna Boulevard Southbound and San Mateo Frontage Rd. Northbound
    • Single Lane closures and turn bays Nov. 17-21 from 9 a.m. - 3 p.m. for installation of Digital Message Sign. Contractor: MWI Inc. No weekend work will take place. Contractor: MWI, Inc.

Site Roadways

  • NM 45 Coors Boulevard east and westbound between Montano Boulevard and Irving Boulevard Milepost 18.07 to 20.9 Project: A300016/A300018  NMDOT with Contractor: Mountain States Constructors, Inc. will be continuing pavement preservation (mill and inlay) work as well as ADA ramp and sidewalk reconstruction and striping through November 20.
    • Motorists can expect day and night time lane closures between Irving Blvd., and Montano through Nov. 20 from 9 :00 a.m. – 4:00 p.m. and also 8 p.m. - 5 a.m. on northbound and southbound Coors Blvd. between Montano to Irving.  NMDOT Project Manager: Emiliano Martinez.
  • NM 45 at Central Ave. NW
    • October 10-Dec. 20, 2016 7 a.m. - 7 p.m. Bradbury Stamm Construction, Inc. Contractor. Roadway construction, signal, lighting work for intersection improvements for the Albuquerque Rapid Transit system. Various lane closures in all directions at intersection.
  • NM 500 Rio Bravo Blvd. between University Boulevard and South Diversion Channel Eastbound
    • Nov. 10-30, 2016 from 9 a.m. - 3 p.m. various lanes closed for utility work. Contractor: Cobb Fendley.
  • New Mexico 528 eastbound and westbound Between 2nd street to Coors /Corrales Road
    • Utility work at intersections will be performed from 9 a.m. - 3:30 p.m. between Nov. 11-Nov. 25. Contractor: Bixby Electric.
  • NM 528 at High Resort Boulevard SE; left turn bay and right turn lane closed from NM 528 onto High Resort for construction of a westbound lane on high resort between NM 528 to Broadmoor Boulevard. from Nov. 17-Feb. 28, 2016; 7 a.m. - 4 p.m. Contractor: Franklins Earthmoving.
  • NM 528 Southbound at Idalia Road-right turn lane closed
    • Nov. 17-22, 2016 from 7 a.m. - 4 p.m. for handicap ramp improvements. Contractor: Franklin's Earthmoving Inc.

For more information log onto www.nmroads.com or call 511

To reach NMDOT District 3 PIO Contact: Bernadette Bell, Public Information | 505-798-6645 | [email protected]