The Design Review/Construction (DRC) Section is responsible for the design review, oversight inspection, and acceptance of public infrastructure installed within City right-of-way and easements.
Prior to constructing public water, sewer, road, drainage, and parks, an approved set of plans along with all required agreements, easements, and permits must be in place. The DRC Section works with the developer and consultant engineer to ensure that all the required documents completed accurately.
The DRC/Construction Section is responsible for the following items related to public infrastructure:
- Review and approve design drawings for water, sewer, hydrology and roads
- Review and process Subdivision Improvement Agreements (SIAs)
- Review, approve and track financial guarantees
- Review and process agreement and covenants, well monitoring permits, license agreements, revocable permits, streetscape agreements, and public easements
- Issue Work Orders for construction of public infrastructure and/or construction of infrastructure list requirements
- Oversight construction inspection of Work Order projects
- Final acceptance of Work Order public infrastructure
- Schedule and conduct warranty inspections
- Update the City Engineer’s Unit Price Guide
Section Manager
Jane Rael, Ph.D., P.E., Principal Engineer - 505-924-3992
DRC Chairman, Financial Guarantees, Engineer Estimates
Stephen Woodall, P.E., Senior Engineer - 505-924-3993
Process DRC Submittals, Schedule DRC Meetings, Distribute the DRC Agenda, Collection of Design Deposit Fees and Engineering Fees, Issue City Project Numbers (CPN), Schedule Pre-construction Work Order Meetings
Monica Ortiz, DRC Scheduler - 505-924-3975
SIAs, Extensions, Amendments, Assignments, Calculate Engineering Fees, Work Orders, Sidewalk Verification and Calculation, Release of Agreements and Financial Guarantee
Marilyn Maldonado, Construction Document Specialist - 505-924-3997
Revocable Permits, License Agreements, Streetscape Agreements, Release of Agreements and Financial Guarantees, Tracking of SIAs, Paper Public Easements
Pam Lujan, Senior Administrative Assistant - 505-924-3996
Schedule Pre-Construction Work Order Meetings, Work Order Distribution, Receive Close Out Packages, Close Out Fees, Work Order Construction Material Submittals, Bid Distributions and Water Meter Releases
Lisa Cornejo, Senior Administrative Assistant - 505-924-3420
Construction Engineer East of the Rio Grande River
Anthony Lopez, P.E., Senior Engineer - 505-924-3422
Construction Engineer West of the Rio Grande River
Paul Olson, P.E., Senior Engineer - 505-924-3421
Design Review and Construction Forms and Documents