Translate Our Site

NMDOT District 3 Roadwork Report through Nov. 30

View the PDF version

All projects scheduled, weather permitting and are subject to change without notice. For online updates to projects visit www.nmroads.com.

Frontage Roads

  • I-40 eastbound frontage road from 7th-8th street
    • Nov. 14-28 from 9 a.m. – 3 p.m. for utility work. Contractor: MWI Inc.
  • I-25 southbound and southbound frontage median at Beverly Hills Ave. (South of Tramway Blvd.)
    • Right lane closure on I 25; Nov. 22-23, 2016 from 9 a.m. – 3 p.m. for utility work. Contractor: MWI, Inc.
  • I-25 northbound frontage between Cutter and Comanche
    • Left lane closed on Frontage road and right lane on the off-ramp to Comanche closed for Digital Message Sign Installation. Contractor: MWI, Inc.

State Roadways

  • NM 14 Sangre De Cristo Intersection right lane closed
    • Nov. 30-Dec. 1, 2016 9 a.m. - 3 p.m. for utility work. Contractor: New Mexico Gas Co.
  • NM 45 Coors Boulevard between Montano Boulevard and Irving Boulevard Milepost 18.07 to 20.9 Project: A300016/A300018  
    • Nov. 15-30, 2016 from 9 a.m. - 4 p.m. (daytime work for paving and striping) and 7 p.m. – 5 a.m. (nighttime work for utility work at intersections). Contractor: Mountain States Constructors, Inc.  Project Manager Emiliano Martinez.
  • NM 448 Southbound at milepost 10.08 - 10.80 (Whitehorse Lane); one lane closure
    • Nov. 28-Dec. 9, 2016 from 9 a.m. – 4 p.m. Kelly Cable of NM will be performing utility work on Southbound NM 448. Motorists watch for flaggers in area and be prepared to Stop.
  • NM 448 (Corrales Road) Northbound at Meadowlark Lane;
    • Nov. 28-Dec. 10, 2016 from 7 a.m. – 5 p.m for roadwork on Meadowlark. Contractor: Albuquerque Asphalt, Inc.
  • NM 500 Rio Bravo Blvd. between University Boulevard and South Diversion Channel Eastbound
    • Nov. 10-30, 2016 from 9 a.m. - 3 p.m. various lanes closed for utility work. Contractor: Cobb Fendley.
  • New Mexico 528 eastbound and westbound Between 2nd street to Coors /Corrales Road
    • Striping will be performed from 8 a.m. – 5:00 p.m. between Nov. 22-23. Contractor: Bixby Electric.
  • NM 528 at High Resort Boulevard SE; left turn bay and right turn lane closed from NM 528 onto High Resort for construction of a westbound lane on high resort between NM 528 to Broadmoor Boulevard. from Nov. 17-Feb. 28, 2016; 7 a.m. - 4 p.m. Contractor: Franklins Earthmoving.

For more information log onto www.nmroads.com or call 511

To reach NMDOT District 3 PIO Contact: Bernadette Bell, Public Information | 505-798-6645 | [email protected]